HIMOINSA has implemented a comprehensive solution for the power supply of a production plant in the Port of Freetown, in the West African region, a strategic area of great importance due to its commercial logistics. Generating sets have been installed to cover the demand of 8.5 MW of power to supply the flour production plant.
This project offers added value to the customer, thanks to the possibility of feeding the surplus energy into the local power grid.
The port of Freetown has very specific space constraints, which posed a challenge for the installation of the equipment. Special tanks were developed for the project design to ensure the required fuel autonomy without compromising the available space.